1. Requirements for straight pipe sections

Inlet / Outlet Straight pipe: The inlet shall be ≥10 × DN; the outlet shall be ≥5 × DN

2. On the grounding point requirements

In order to make the instrument work reliably, improve the measurement accuracy, without external parasitic potential interference / sensor should have a good grounding, grounding resistance is less than 10. (If the metal pipe is well grounded, no special grounding device) The position requirements are shown in the figure

Insert the electromagnetic flowmeter according to the scene of the pipeline is not the case, do not install the ball valve flowmeter should be installed without pressure on the pipeline (that is not installed with pressure can choose not to install ball valve flow meter) in the pipeline openings Diameter 50, ready to weld welded pipe in the pipe openings; for continuous flow or unloading does not allow media overflow occasions, to be installed ball valve, that is, select the structure with plug-in electromagnetic valve flowmeter; in the pipe hole Diameter 50, ready to weld the welded pipe in the pipe opening

Battery Powered Electromagnetic Flow Meter :http://www.kunlunsensors.com/productpage.php?pid=96

Slurry Flow Meter :https://www.youtube.com/watch?v=AVPFnAjiJnc

Automatic Tank Gauges :http://www.kunlunsensors.com


RECENT POST
  • Grey Google+ Icon
  • Grey Twitter Icon
  • Grey LinkedIn Icon
  • Grey Facebook Icon

© 2023 by Talking Business.  Proudly created with Wix.com

bottom of page